Moves the KPIs an airport is judged on, directly.
Added value
-
Plan a safe and compliant work area
Plan and assure the airside is safe — and prove it to the regulator.
- Always up-to-date and accurate map
- Create work area boundaries
- Instantly check compatibility with other planned work areas
- Distance checks
- Audits
-
Plan agile and automated works
Every works request is coordinated with stakeholders, from request to authorised.
- Works ticket created automatically
- Works ticket automatically collects related closures, NOTAMs and temporary measures
- Users can chat, share files and sign off tasks
- Workflow via request, develop, authorise and close
- Manual entries to link wingtip clearances and distance measurements
-
Assure operational continuity
Keep the airport running while the works are underway.
- Close or limit airport infrastructure in a few clicks
- Automated demand–capacity balancing
- Weather probabilities
- Automated Gantt planning
- One-click Digital NOTAM
-
Assure compliant measures
A temporary measure has a reason, a lifetime, an audience and a closeout. AWM tracks all four.
- Drag and drop equipment onto its real-world position
- Plan and design measures to real-world scale
- A library of global-standard and local objects
- Place equipment on site from the mobile app
- Less time spent in the manoeuvring area during set-up
-
Publish for airport and network
The closure drawn on the map becomes the notice the network reads.
- Digital NOTAM drafted from the closure itself
- ICAO NOTAM and Digital NOTAM derived, not typed
- Draft, review, publish, cancel
- One record the airport and the network both read
- Every notice traceable to the works that caused it
-
Publish compliant AIXM
One source for the airside, in the format the industry already reads.
- AIXM in and out, where the network requires it
- Full temporality model, not just today's state
- Plugs into the GIS already in use
- API data services for the rest of the airport
- Automated data quality audits
Demonstrations
The product, running.
-
Demand & capacity balancing, automated
Demand & capacity
Proposed 06:00–11:00
Checking the window 06:00–11:00 against stand demand
3 short
Stands run out at 08:00. This window sits under the morning bank.
Works 06:00–11:00 Short · 2 hrsAvailable Closed & short DemandIllustration — not real UI
- Closures proposed by the works, checked against the morning demand.
- Three stands short at the 08:00 peak — found before it is committed.
- The window is assessed, not approved — the call stays with the planner.
-
Checks global and local business rules before publishing
Checks before publish
WRK-2419 · TWY A · Apron D
- VR-03 End of the closure is after its start 03:00 later Pass
- VR-01 No start date in the past +6 h 24 m Pass
- TS-011 No overlapping temporary change on TWY A none found Pass
- ACS Wingtip clearance against the work area 52.0 m ≥ 50 m Pass
- OR-01 Simultaneous stand closures, winter season 7 of 8 Warning
4 pass · 1 warning · 0 blocking
Global and local rules · published with the warning on the record
Illustration — not real UI
- Global and local business rules, run against one real works request.
- Four pass; one raises a warning that does not block.
- It names which rule, and by how much.
-
Control the works via an automated Gantt
Works programme · EADD
9 packages · 12 weeks
- RWY 18R edge lights
- Apron D — stand rehabilitation
- TWY B resurfacing
- Apron C joint seal
- Stand D9 kerb repair
- RWY 18R centreline remark
- TWY C shoulder repair
- Apron B drainage
- Stand C4 rehabilitation
Live at once,
week by weekConcurrent works ceiling · 3W1W3W5W7W9W11As requested — 9 packages, 12 weeks.
W5: 5 live — over the ceiling in 2 weeks. Flagged, not blocked.
Resequenced in place — 2 packages moved, none cut, same 12 weeks.
Illustration — not real UI
- The programme redraws itself as works are added, moved or closed.
- Concurrent works against the ceiling, week by week — amber, not blocked.
- Fly to any work area straight from its bar on the chart.
-