Airside works are a KPI problem before they are an engineering problem.

Safety, on-time performance and maintenance delivery all run through the same bottleneck: how well the works programme is planned, assured and published. AWM is where that happens.

Works programme · EADD

9 packages · 12 weeks

  • RWY 18R edge lights
  • Apron D — stand rehabilitation
  • TWY B resurfacing
  • Apron C joint seal
  • Stand D9 kerb repair
  • RWY 18R centreline remark
  • TWY C shoulder repair
  • Apron B drainage
  • Stand C4 rehabilitation

Live at once,
week by week

Concurrent works ceiling · 3
W1W3W5W7W9W11

As requested — 9 packages, 12 weeks.

W5: 5 live — over the ceiling in 2 weeks. Flagged, not blocked.

Resequenced in place — 2 packages moved, none cut, same 12 weeks.

Illustration — not real UI

  • Safety

    Work areas defined, checked against clearances, and evidenced as they change. Fewer unmanaged interactions between works and live operations.

    [TBC: metric]

  • On-time performance

    Works planned against actual demand and capacity, so closures land in the windows that cost the fewest movements.

    [TBC: metric]

  • Maintenance delivery

    More works executed per available window, and a backlog that comes down without new infrastructure.

    [TBC: metric]

Each card states the mechanism — how AWM acts on the number. Outcome figures are not published until there is a source behind them.

Before and after

Today, and with AWM

The same five things you already do, before and after the system exists to carry them.

Today With AWM
  1. 01 Producing the picture

    Assembled by hand from CAD, spreadsheets and memory

    One live picture, always current

  2. 02 Changing the plan

    Re-export, re-draw, re-send

    Change once; everything downstream follows

  3. 03 Informing the APOC

    A deck, rebuilt

    A shared view they can open themselves

  4. 04 Issuing the NOTAM

    An email chain and a retype

    One click, from the same data

  5. 05 Proving it afterwards

    Reconstructed from whatever was kept

    Already recorded, as the work happened

No time-saving percentages appear here. metric a figure ships only once there is a source behind it.

Standing still

The cost of standing still

The works programme is growing, the scrutiny is tightening and the data expectations are hardening. The manual process does not scale with any of them.

  • Maintenance backlogs
  • Traffic growth
  • Tighter safety requirements
  • Digital data standards
  • Sustainability

The five drivers in full

Take it with you

Take it into the meeting

A one-page summary of the argument on this page, in house style, for a board or executive pack.

Download the leadership brief (PDF)coming soon